Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />O L O <br />Denver, Colorado 80203 ION o? <br />o <br />Phone: (303) 866-3567 RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> -&- <br /> SAFETY <br />April 27, 2009 APR 3 0 2009 <br />Division of t-tec:2matioFl, Bill Ritter, Jr. <br />Judy DeVincentis VIA FACSIMILE (970) 249-0590 and US Malik mg and Safety Governor <br />Western Gravel, Inc. Harris D. Sherman <br />3001 North Townsend Avenue Executive Director <br />Montrose, CO 81401 Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />RE: Third Continuance ?fFormal Board Hearing,° <br />Reason to Believe a Violation Exists, Olathe. Pit, Permit No. M-1984-108. <br />Dear Ms. DeVincentis: <br />On February 3, 2009, the Division noticed Western Gravel of a Formal Board Hearing for consideration <br />of possible violation of C.R.S. 34-32.5-117(4)(b)(1) for failure to maintain sufficient financial warranty to <br />assure the completion of reclamation, and C.R.S. 34-32.5-117(4)(c)(II) for failure to submit a financial <br />warranty within 60 days of adjustment at the Olathe Pit. The adjustment in financial warranty was <br />warranted to assure the protection of water resources and compliance with Colorado water laws <br />governing injury to existing water rights. The hearing was scheduled for March 11 and 12, 2009. <br />Subsequently, the Office of the State Engineer (OSE) confirmed receipt of the Olathe Pit Substitute <br />Water Supply Plan (SWSP). In an effort to accommodate the review process of the OSE, the Division <br />continued the Formal Board Hearing to April 8 and 9, 2009 and then again to May 13 and 14, 2009. <br />Recent communication from the Operator, dated April 21, 2009, indicates the review process of the <br />Olathe Pit SWSP nears completion. The Office of the State Engineer has confirmed such progress. <br />Therefore, the Division has continued the Formal Board Hearing to June 10 and 11, 2009. Please bear <br />in mind the Division still has reason to believe a possible violation of C.R.S. 34-32.5-117(4)(b)(1) and <br />C.R.S. 34-32.5-117(4)(c)(II) exists. <br />Therefore, a Formal Board Hearing will be held at the June 10 and 11, 2009 Board meeting for <br />consideration of a possible violation. The hearing will be held in Room 318 of 1313 Sherman Street, <br />Denver, Colorado, beginning at 9:00 a.m. on June 10th and 11th or as soon thereafter as the matter can <br />be considered. The conditions previously stated in the Division's notice, dated February 3, 2009, remain <br />intact. However, the date of the hearing, originally scheduled for March 11 and 12, 2009, has been <br />continued to June 10 and 11, 2009. <br />Sinter <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />cc: Sitira Pope, Secretary to the MLRB, fax (303) 832-8106 <br />Steve Shuey, Senior Environmental Protection Specialist, fax (970) 241-1516 <br />Bob Hurford, Division 4, DWR, fax (970) 249-8728 <br />Office of Office of <br />Mined Land Reclamation Denver 9 Grand Junction 9 Durango Active and Inactive Mines