My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-28_REPORT - M2001107
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001107
>
2009-01-28_REPORT - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:21:37 AM
Creation date
2/5/2009 10:56:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
REPORT
Doc Date
1/28/2009
Doc Name
Annual Fee/Report/Map
From
NCC
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.qw <br />NORTHERN COLORADO CONSTRUCTORS, INC. <br />/ 9075 WCR 10' Fort Lupton, CO 80621 <br />'r? r 303-857-1754 <br />FAX: 303-857-2933 <br />Date: 1/17/2009 <br />Permit Name: Norther Colorado Constructors Inc. <br />Permit No: t/ M-2001-107 <br />Operation Name: NCCI Pit # 1 <br />REF: Annual fee and Repoli <br />Dear, State Of Colorado <br />Northern Colorado Constructors Inc. Aggregate Division annual report is as follows <br />for the construction of NCC Pit # 1. <br />1.) DISTURBANCES TO AFFECT LAND: <br />a. Phase 1 <br /> 1. Mining in progress <br /> ii. No Reclamation as of 1/27/09 - Liner Design being reviewed <br />b. Phase 2 <br /> L Mining in progress <br /> fl. No Reclamation as of 1/27/09 - Liner Design being reviewed <br />C. Phase 3 <br /> 1. Mining in progress <br /> ii. No Reclamation as of 1/27/09 - Liner Design being reviewed <br />d. Phase 4 <br /> I. Mining in progress <br /> H. No Reclamation as of 1/27/09 - Liner Design being reviewed <br />e. Phase 5 <br /> 1. Mining in progress <br /> fl. No Reclamation as of 1/27/09 - Liner Design being reviewed <br />f. Phase 6 <br /> 1. Topsoil Stockpile Area <br />g. Phase 7 <br /> 1 Pit Entrance <br /> fl. Certified Scale in operation. <br /> iii. Gravel Processing Equipment in place and operation as 5/04 <br /> iiii. Product Stock Piling Area <br />2.) UPCOMING YEAR OCCURRENCES: <br />a. Upcoming for 2009, Reclamation is anticipated to start in Phases <br /> # 3, # 4, # 5, - Liner Design under review <br />b. As of 1/27/09 Phases # 3, 4, 5 have been overlotted and currently <br /> extracting gravel. <br />C. Phases # 1, 2 currently used as fresh water supply to the washing plant <br /> and sedimentation holding ponds. <br />ICTIVE J <br />'JAN 2 6 2009 <br />Division or Declamation, <br />tO Mining and Safety <br />d. Screening Operations and Product Stock Piling <br />3. OTHER: <br />a. Liner / Reclamation Design near complete. Reclamation Construction anticipate to begin Summer 2009 <br />Chris Zadel <br />Construction Manager
The URL can be used to link to this page
Your browser does not support the video tag.