My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-26_HYDROLOGY - M1984108
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1984108
>
2009-01-26_HYDROLOGY - M1984108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:05 PM
Creation date
1/28/2009 8:00:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984108
IBM Index Class Name
HYDROLOGY
Doc Date
1/26/2009
Doc Name
water augmentation
From
Western Gravel, Inc.
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTERN GRAVEL, INC. <br />3001 NORTH TOWNSEND MONTROSE, COLORADO 81401 <br />PHONE 249-2431 FAX 249-0590 <br />2223 H-75 DRIVE DELTA, COLORADO 81416 <br />PHONE 874-6905 FAX 874-9805 <br />January 23, 2009 <br />REC,F=IVED <br />JAN 2 6 2009 t/ <br />Division of Reclamation, Mining and Safety Division of Rec,amation <br />Department of Natural Resources Mining and Safety <br />Attention: Wally Erickson <br />691 County Road 233, Suite A-2 <br />-Durango, CQ $1301 _ -- _ - _-_ - _ f <br />RE: Olathe Pit DRMS Permit No. M-1984-108 <br />Dear Mr. Erickson, <br />When Western Gravel, Inc. was originally contacted about the issue of the water <br />augmentation for the Olathe Pit, Western contacted Wright Water Engineers in Durango <br />to proceed with the appropriate paperwork for the substitute water supply plan and well <br />permit. <br />As many of you are aware the construction economy during the latter part of 2008 was <br />very difficult. The process was stalled due to funding to finalize the project with Wright <br />Water Engineers. We have since taken care of the funding issue and have Wright Water <br />finalizing the well permit paperwork with the Division of Water Resources. <br />Western Gravel, Inc. has not forgotten the requirements and their commitment to meet <br />the requirements of the Division of Reclamation, Mining, and Safety. At this point in <br />time, we are attempting to resolve the water issue by working through the Wright Water <br />Engineers and the Division of Water Resources. I spoke with Peter Foster of Wright <br />Water Engineers who estimated the finalization should be complete by the end of <br />February or shortly before. <br />Western Gravel would like to thank you for working with us during the past year. If you <br />have any other concerns, please contact Judy DeVincentis or Shauna Hovey at 970-249- <br />2431. <br />Sincerely, <br />i <br />dy D incentis <br />CEO
The URL can be used to link to this page
Your browser does not support the video tag.