Laserfiche WebLink
~ t'~ VII <br />KIRKLAND CONSTRUCTION L.L.L.P. <br />P.O. Box 580 Rye, Colorado 81069 <br />719/489-3385 <br />FAX 719/489-2268 <br />Equal Opportunity Employer <br />~~ ~ January 19, 2009 <br />Division of Reclamation, Mining, and Safety/ <br />Grand Junction Field Office <br />101 S 3`d Street, Suite 301 <br />Grand Junction, CO 81501 <br />RECEIVED <br />JAN 2 0 2009 <br />GRAND JUNCl't()rt h1ELD OFFICE <br />DMSiON OF <br />RECLAMATION MINING ~ SAFETY <br /> <br />Re: DeBeque Gravel Pit, Permit No. M-1981-058," Response to Preliminary Adequacy <br />Review of Technical Revision No. 3 ~/ <br />Attention <br />Dear Travis, <br />Travis Marshall <br />Environmental Protection Specialist <br />~~~~~~® <br />pivision of Reclamation' <br />Mining and Safety <br />JQN L ~ Z~Oq <br />This is in response to your Preliminary Adequacy Review of Technical Revision No. 3 <br />application, TR-03 <br />1) Please find the detailed figure showing the proposed direction of mining <br />and the proposed shape of the pit. <br />The area we plan to mine is outlined in blue as identified in the map we <br />submitted to you. We plan to mine from the north to the south in the <br />southern portion of the mining area. If we cannot mine deep enough in the <br />southern portion of the mining area to produce all of the material needed, <br />we will mine from the south to the north in the narrow, northern portion of <br />the mining area. <br />2) The total 8 acre crusher and stockpile area maybe disturbed if needed as <br />identified iri response No. 1. <br />If you need any additional information, please contact our office at 719-489-3385. <br />Cordially, <br />C- <br />Joe C. Baxter <br />Cc: Thomas F. & Ginger Latham <br />