My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-16_HYDROLOGY - C1981028
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981028
>
2009-01-16_HYDROLOGY - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:42:56 PM
Creation date
1/20/2009 2:17:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
HYDROLOGY
Doc Date
1/16/2009
Doc Name
4th Quarter 2008 Sediment Pond Inspection Report Review
From
DRMS
To
Coors Energy Company
Permit Index Doc Type
Sediment Pond Inspect
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />January 16, 2008 <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Mr. Donald MacDonald Harris D. Sherman <br />Coors Energy Company Executive Director <br />P.O. Box 467 Ronald W. Cattany <br />Golden, CO 80402 Division Director <br />, Natural Resource Trustee <br />Re: Keenesburg Mine, Permit No. C-1981-028, Fourth Quarter 2008 Sediment Pond Inspection Report <br />Dear Mr. MacDonald: <br />The Division has reviewed Coors Energy Company's Fourth Quarter 2008 Sediment Pond Inspection report. <br />CEC's Fourth quarter 2008 sediment pond report was received by the Division on December 23, 2008. <br />Sediment pond inspections were conducted by CEC on December 18, 2008. <br />No problems were noted for any of the impoundments in the report. No discharge from any of the ponds <br />was reported. CEC did not identify any maintenance required as a result of this inspection. The <br />observations noted in CEC's Fourth quarter inspection reports agree with the Division's on site observations. <br />Thank you for your submittal of the quarterly sediment pond inspection report. <br />Sincerely, <br />.......... <br />ital Protection Specialist II <br />944 <br />C:1 hb/C81028/Inspections/2008 Ponds/4th quarter.doc <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.