Laserfiche WebLink
01/30/2008 13:33 FAX 970+874+8366 COLORADO LIME CO. <br />Department of Natural Resources <br />--o Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />1?'f10U:?.`000Z <br />January 30, 2008 <br />y ea ?? 5 , Jd-e <br />Attention: Erica Crosby, Environmental Protection Specialist <br />RE: Monarch Quarry, Permit M-2000-098, Tech Revision 01; Adequacy Letter <br />Dear Erica: <br />This letter is in response to your letter dated January 15, 2008 concerning the adequacy of Colorado Lime's <br />application for Tech Revision #01. <br />In order to adequately and accurately address the items outlined in your letter, we need to do some surveying of <br />the road and pond, and we will not be able to do this surveying until this spring, after the snow is gone from the <br />pond area. If this year is like last, we should be able to do the surveying mid to late April, and have the designs <br />completed by mid-May. <br />With this in mind, Colorado Lime requests an extension on the decision date on this TR until May 15, 2008 and <br />we do waive our right to a decision by January 30, 2008. <br />Please contact me at the number shown above or by email at tracyaunn&uslm.com if you have any questions, <br />concerns or need additional information. <br />Respectfully, ?y <br />Tracy Gunn, General Manager <br />Colorado Lime Company <br />SCA N F <br />D