My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-06_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-10-06_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:54 PM
Creation date
10/7/2008 3:52:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
10/6/2008
Doc Name
Cost Estimate
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
TR50
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine C-1981-038 <br />Technical Revision 50 <br />PROJECT IDENTIFICATION <br />Date : 6-Oct-08 Permit C-1981-038 Site: Bowie No. 1 Mine <br />User: JRS State : Colorado <br /> Filename: C038-240 County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Technical Revision 50 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />241 Plug and Seal Exploration Holes BV-1 and BV-2 8.00 $3,218 <br />242 Regrade Drill Pads 4.06 $842 <br />243 Regrade Light-Use Road 6.58 $1,365 <br />244 Replace Topsoil from Stockpile to Drill Pads 1.83 $381 <br />245 Replace Topsoil from Stockpile Light-Use Road 3.47 $720 <br />246 Reseed Drill Pads 0.92 $630 <br />247 Reseed Light-Use Road 1.74 $1,191 <br /> <br /> <br /> Direct Cost Total 26.60 $8,347 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) $129 <br /> Performance Bond (1.05% of Direct Costs) $88 <br /> Job Superintendent (at $41.25/hour) 13.30 $549 <br /> Profit (10.00% of Direct Costs) $835 <br /> <br /> <br /> Total Overhead and Profit $1,600 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $9,947 <br /> <br /> <br /> Legal - Engineering - Project Mana eg ment <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $423 <br /> Reclamation Management and Administration (3.25% of Contract) $323 <br /> <br /> <br /> TOTAL BOND AMOUNT $10,693 <br />jrs Page 1 10/6/2008
The URL can be used to link to this page
Your browser does not support the video tag.