My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-24_REVISION - M2002111 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002111
>
2008-09-24_REVISION - M2002111 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:02:59 PM
Creation date
9/29/2008 10:31:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
REVISION
Doc Date
9/24/2008
Doc Name
Pre-phase to the mining plan
From
Brownfield Restoration Group, Inc.
To
DRMS
Type & Sequence
TR2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BR.OWNFIELD RESTORATION GROUP, LLC <br />ROCHESTER, NY • WASHINGTON, DC <br />September 23, 2008 <br /> <br />VIA Fax followed by Hard Copy SEP 2 9 2000 ?c ? ??; <br />Division of Reclamation, <br />Mining and Safety SEP 2 4 2008 <br />Mr. Travis Marshall / GRAND JUNti 3, . _v,; OFFICE <br />I,/ DIVISI&- <br />Division of Reclamation, Mining and Safety RECIAMATIof\l & <br />???pr <br />Department of Natural Resources <br />101 South 3rd, Suite 301 <br />Grand Junction, CO 81501 / <br />RE: Gilsonite Pit, Permit Number M-2002-111 - Pre-Phase to the Mining Plan <br />Dear Mr. Marshall, <br />We are in receipt of your September 15, 2008 letter requesting a revised mine plan that includes pre-phase <br />work. We understand that this request is being made such that the proper bonding level can be determined. <br />We propose to install a gate at the eastern entrance to the mine across the existing 12 foot (approximate) <br />wide road that boarders the proposed mining area along the south. The gate will consist of three to four <br />inch diameter steel pipe and will be hinged on a sin inch diameter steel pipe post. Opposite the hinged end <br />will be another six inch diameter post that will allow the gate to be locked. The gate will be approximate 30 <br />to 36 inches above grade. <br />Figure A, enclosed herewith, shows the proposed location for the gate. <br />If you have any further questions or need further details on our proposed pre-phase to the mine plan, please <br />contact me at the phone number below or via email at cherrmann@brg-llc.com. <br />Sincerely, <br />Christopher J. Herrmann <br />enclosure <br />cc: Gayle Lyman - Elam Construction w/ enclosure <br />pAprojects\fruita refinery\gravel permit\pre-phase letter.doc <br />BRG BROWN1 101) 14ST(N NMON GROUP, 1.11` <br />CORPORATE SQUARE ' 55 NORTH Sa'R1:1.'I' CANANDAIG1 A, N 1. 1.44"24 ' (595)393-9:U)0 • FAQ: (585) :I93-93510
The URL can be used to link to this page
Your browser does not support the video tag.