My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-08_REVISION - C1981047 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981047
>
2008-09-08_REVISION - C1981047 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:07 PM
Creation date
9/8/2008 1:48:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
REVISION
Doc Date
9/8/2008
Doc Name
Bond Release Inspection Letter
From
DRMS
To
OSM
Type & Sequence
SL2
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />September 8, 2008 <br />Henry Austin <br />Office of Surface Mining <br />Western Regional Coordinating Center <br />P.O. Box 46667 <br />Denver, Colorado 80201-6667 <br />RE: Blue Ribbon Mine, Permit No. C-81-047, Minrec, Inc. <br />SL-2, Phase II and III Bond Release, Bond Release Inspection Report <br />Dear Mr. Austin: <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Attached is one copy of the Division's inspection report for the August 27, 2008 Phase II and III <br />Bond Release inspection at the Blue Ribbon Mine. Please note that a summary of the results of <br />the bond release inspection can be found on pages one and two of the comment section of the <br />report. <br />Because additional reclamation work needs to be done, notably backfilling and grading and <br />establishing an appropriate vegetative cover for sediment ponds 4 and 5, the Phase II and III final <br />bond release can not be granted at this time. Once the additional reclamation work has been <br />accomplished, a second bond release inspection will be conducted to verify the results. Your <br />agency will be notified of the date and time of this second inspection, should you want to attend. <br />If you have any questions, please call me. <br />Sincerely, <br />,D.J? <br />osep J. dash <br />Environmental Protection Specialist <br />Attachment <br />c:\word\blueribbon\sl2osm insp let I <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.