Laserfiche WebLink
<br /> <br />' i o Division of Reclamation, Mining and Safety <br />0%' Reclamation Report for the Year 2007 <br />King I <br />mine name <br />C-1981-035 <br />permit # <br />National King Coal,LLC <br />Permittee <br />Address: 4424 C.R. 120, Hesperus, CO 81326 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be dearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 10.88 + 0.00 = 10.88 <br />Acres backfilled and graded 0.50 + 0.00 = 0.50 <br />Acres to soiled 0.50. + 0.00 = 0.5 0 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final. Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears ' <br />Acres seeded* 0.50 + 0.00 = 0.50 = 0.50 + 0.50 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed <br />Phase I released 0.00 Phase 11 released 0.00 <br />For Mines in Permanent Cessation: <br />Phase III released 0.00 <br />Total acreage in facilities subject to reclamation but yet to be completed N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z <br />Acreage in active mining areas s <br />1(exclude acres where Phase III release has been achieved) <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitorirut sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parting; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbacc611ed and <br />graded areas of refuse piles, coal mine waste impoundments, head-0f4xglow fills, and valley Nis; ventilation shahs and entryways; <br />and nonaral waste disposal area (garbage dumps and coal c ombushor try-products disposal areas} <br />10.88 <br />10.88 <br />10.88 and the total number of acres: <br />3 Includes pits. topsoil stripped areas in advance of pits, and spoil not badkflled and graded