My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-18_REVISION - M2004025
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004025
>
2008-04-18_REVISION - M2004025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:16 PM
Creation date
4/24/2008 8:01:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
REVISION
Doc Date
4/18/2008
Doc Name
Technical revision in the current mine plan
From
Farnsworth Construction & Gravel Co.
To
DRMS
Type & Sequence
TR1
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apri13, 2008 <br />~` Farnsworth Construction & Gravel Co. <br />175 Hwy 133 <br />Paonia, Co. 81428 <br />Colorado Division of Mining, Reclamation and Safety <br />101 S. 3~ Street, Rm 301 <br />Grand Junction, Co. 81501 <br />,~~?_~~ <br />~~~ <br />APR 18 2ppg / <br />~ta~~o ~tS~~c ~ ~~s~ ~ ~~_~ c~~~ic~ <br />~~v~sia~ o~ <br />~~c~r~.~rioti ~~~~~^ ~ s.~~rv <br />R~C~~~~~ <br />Attention : Steve Shuey <br />_ _ - ~/ _ _ ~~~ 2 2 2ooa <br />RE: Technical Revision North Fork Pit M-2004-025 ~s'~~ ~~~ a-t.~,k~ <br />Dear Steve: <br />In the current mine plan, topsoil would be stripped from approximately <br />8.07 acres initially. We propose to strip as we are ready to mine an area. <br />Topsoil will be stockpiled on the east side of the property initially and then <br />begin on the south side. The original quantity of 3255 cubic yards of topsoil, <br />is probably incorrect because we will not be stripping as large an area as <br />originally anticipated. However, all topsoil available when stripping will be <br />stockpiled. Topsoil will be stockpiled with a loader to what the loader is <br />capable. The cable TV line will not be moved until the mining approaches its <br />location. <br />ADS or D6 dozer, a trackhoe, loaders and possibly trucks will be used <br />in the mining operations. Mining will begin on the northeast end of the permit <br />area. We will not be utilizing a Phased program. Reclamation will occur <br />upon completion of mining. A trench will not be dug around the perimeter of <br />the permit area. Rather, a pump will be placed_in the area if any water__ <br />surfaces in the mining area. If any water is encountered it will be pumped to <br />a ditch with straw bales to prevent contamination and then can flow back to <br />the river or into our current pond. <br />Material mined will be moved across the river via a bridge or a low <br />water crossing to be processed. <br />Sincerely, <br />Patncia,M. Farnsworth <br />
The URL can be used to link to this page
Your browser does not support the video tag.