Laserfiche WebLink
TABLE OF CONTENTS <br />• Pate <br />V. MINE SURFACE FACILITIES RECLAMATION PLAN ...................................................V-1 <br /> V.A Water Quantity and Quality Control Plan ...................................................... ........ V-1 <br /> V.A.1 Water Quantity Control Plan ............................................................. ........ V-1 <br /> V.A.2 Water Quality Control Plan ............................................................... ........ V-4 <br /> V.B Design, Construction and Operation of Ponds and Waste Banks ................ ........ V-5 <br /> V.6.1 General V-5 .................................................................................... ........ V-5 <br /> V. B.2 Dewatering Mechanics ..................................................................... ........V-5 <br /> V.B.3 Disposal Site Characteristics ............................................................ ........V-7 <br /> V.6.4 Sedimentation Ponds Design ........................................................... ........ V-8 <br /> V.6.5 Waste Banks Design ........................................................................ ...... V-12 <br /> V.B.6 Post Reclamation Sediment Control ................................................. ...... V-14 <br /> V.C Diversions ..................................................................................................... ...... V-15 <br /> V.D Storage and Disposal of Acid-Forming, Toxic-Forming and Combustible <br /> Materials ........................................................................................................ ..... V-16 <br /> V. E Disposal of Mine Development Waste .......................................................... ..... V-17 <br /> V.F Sealing of Mine Openings and Drill Holes ..................................................... ..... V-17 <br /> V.G Backfilling and Contouring ............................................................................. .....V-21 <br /> V.G.1 Revegetation Study with Various Topsoil Depths .............................. ..... V-22 <br /> V.H Removal, Storage and Redistribution of Topsoil ........................................... ..... V-23 <br />• V.I Revegetation ................................................................................................. ..... V-29 <br /> V.1.1 Introduction ........................................................................................ ..... V-29 <br /> `!.1.2 General Specifications and Environmental Limitations ..................... ..... V-30 <br /> V.1.3 Phases and Timing ............................................................................ ..... V-32 <br /> V.1.4 Site Preparation Techniques and Materials ....................................... ..... V-35 <br /> V.1.4.a Seed Selection ................................................................... ..... V-35 <br /> V.1.4.b Fertilizer .............................................................................. .....`/-37 <br /> V.1.4.c Mulch .................................................................................. .....V-37 <br /> V.1.4.d Seedbed Preparation .......................................................... ..... V-38 <br /> V.1.4.e Seeding Operations ............................................................ .....V-39 <br /> V.1.4.f Planting Time ...................................................................... .....V-39 <br /> V.1.4.g Evaluation and Follow-up ................................................... .....V~5 <br /> V.1.4.h Riparian Revegetation ........................................................ .....V-45 <br /> V.1.4.i Remedial Treatment of Refuse Area 1 ............................... ..... V~8 <br /> V.J Determination of Revegetation Success ....................................................... ..... V-53 <br /> V.J.1 Introduction ......................................................................................... .... V-53 <br /> V.J.2 Revegetation Success Criteria ........................................................... .... V-54 <br /> V.J.3 Sampling Methodology for Determining Revegetation Success ......... .... V-63 <br /> V.J.4 Literature Cited (Sections I and J) ...................................................... .... V-64 <br /> V.K Reclamation Cost Estimate ............................................................................ ....V-65 <br />• V.L Weed Management ........................................................................................ ....V-65 <br /> Midterm Review (8/2002) <br />