My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-16_GENERAL DOCUMENTS - C1981042
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981042
>
2008-04-16_GENERAL DOCUMENTS - C1981042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:00 PM
Creation date
4/17/2008 11:00:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981042
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/16/2008
Doc Name
E-mail Regarding Arness McGriffin Termination of Jurisdiction
From
David Berry
To
Dan Hernandez
Permit Index Doc Type
General Correspondence
Email Name
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />Hernandez, Daniel <br />From: Berry, David <br />Sent: Wednesday, April 16, 2008 9:01 PM <br />To: Hernandez, Daniel <br />Cc: Brown, Sandy; Kaldenbach, Tom; Erickson, Wally <br />Subject: RE: Arness-McGriffin Termination of Jurisdiction <br />Good. Thanks. <br />From: Hernandez, Daniel <br />Sent: Wed 4/16/2008 4:19 PM <br />To: Berry, David <br />Cc: Brown, Sandy; Kaldenbach, Tom; Erickson, Wally <br />Subject: Arness-McGriffin Termination of Jurisdiction <br />Dave - <br />Sandy and I met with OSM (Henry Austin, Christine Belka, Elizabeth Shaeffer, and Howard Strand) this <br />afternoon. One of the topics discussed at the meeting was our proposal to terminate jurisdiction at the Arness- <br />McGriffin site without conducting vegetation sampling. <br />We discussed the site's regulatory history, its reclamation history, its current condition and its heavy use by the <br />public. We provided OSM with an a-mail from DOW stating that maintenance of the Arness-McGriffin access <br />road is DOW's responsibility. We informed OSM that we have used all forfeited bond monies for both the Arness- <br />McGriffin site and the Coal Gulch site. We described our plan to conduct Year Nine and Year Ten sampling at the <br />Coal Gulch site this summer and next. We informed OSM of our belief that the size and condition of the Arness- <br />McGriffin site would likely preclude valid vegetation sampling at that site. We informed OSM of our plans to <br />nevertheless conduct termination of jurisdiction "bond release" inspections for both sites in the fall of 2009 <br />following Year 10 sampling at Coal Gulch. We informed them of our plans to invite whatever surface landowners <br />existed in the summer/fall of 2009 to attend the "bond release" inspections, and of our plans to follow as closely <br />as possible our regulatory procedures for termination of jurisdiction at permitted sites. <br />After a bit of further discussion, OSM agreed to allow us to proceed with our proposal <br />4/17/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.