My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00029 (3)
DRMS
>
Back File Migration
>
Report
>
REP00029 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 2:42:14 AM
Creation date
3/31/2008 10:43:06 PM
Metadata
Fields
Template:
Z_TEMP_REPORT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIIIIIIIIIIIIIIIIII ` <br /> 999 <br /> Notice of Intent to Continue Mining Opera t-1 6ns' <br /> 110(2) Annual Report <br /> 2 ? 399d <br /> Permittee Name: Colo Minerals Recovery Corp <br /> Permit No: M-89-068 <br /> Operation Name : Centennial * <br /> Anniversary Date: 09/27/94 <br /> Total : $225.00 (Due on your Anniversary Date) <br /> 1 . Has this mine been granted TEMPORARY CESSATION STATUS? ES / NO <br /> Does. this mine operate MORE or LESS than 180 days per year? MORE 6CS3D <br /> Do you extract MORE or LESS than 70,000 tons of mineral or <br /> overburden a year? MORE EE SI <br /> 2 . Does this mine have a phased reclamation plan? YES (-Np <br /> 3. Permitted acreage: y, & <br /> 4. Total acres affected during the report year: * a <br /> 5. Total acres reclaimed for the report year:* <br /> 6. Total acres in various stages of reclamation:* <br /> a. Backfilled: d. Topsoil replaced: e- <br /> b. Graded: Average topsoil thickness <br /> c. Seeded: <br /> replaced: �- <br /> List species seeded & seeding <br /> rate for report year on back <br /> 7. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year:* e- <br /> 8. Estimated total acres nto be affected in the next report year: * <br /> 9. COMMENTS: d- Lni a�rC �� ,� , U.-I a�A� c�La ,A, <br /> * Please show the location of the acreage for items 4 - 6 on your map** . <br /> Indicate the phases of the reclamation which have been completed, correlated with <br /> your timetable. <br /> ** NOTE: If there have not been any changes since the last annual report and you <br /> previously submitted a map which correctly depicts the current acreage in items 2 <br /> through 6, then a new map is unnecessary. However , this must be stated above. <br /> Signature: [� C Date: <br /> Please type or print <br /> ttpcurrent contact name, mailing address , and phone number below: <br /> Contact Name : (mow � �, Phone : (3 0 3 ) 96 M - 285-2- <br /> Company: <br /> �r;� 3/ C 1c0) 303 -k(o�{-7' (3 <br /> Address : P6) S <br /> c l4 (�, 10 , 11� 3o3 -S(�4 -fig e <br /> J O <br /> 9 <br /> Federal Tax ID No. or Social Security No. : <br />
The URL can be used to link to this page
Your browser does not support the video tag.