My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-22_PERMIT FILE - C1981012 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2007-10-22_PERMIT FILE - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:11 PM
Creation date
2/7/2008 10:10:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Permit File
Doc Date
10/22/2007
Section_Exhibit Name
Exhibit 19 Pond 001 As-Built Certification
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peak Project Management, LLC <br />34115 County Road 20.8 T "rndad CO 81082 <br />Telephone: (719) 846-4975 Fax: (719) 8~~(719) 859-0111 <br />" ronthompson@wildbiue.net <br />z s zoos <br />NEW ELK COAL COMPANY t?lvfswn of Reclamati0rl~ <br />lining artd Safeiy <br />New Elk Mine <br />Permit No. CO-81-012 <br />Re: As-Built Certification for Sedimentation Pond 001 <br />Design plans for sedimentation pond number 001, compiled ' gore 5 of the New Elk <br />Mining Permit, certified by Charles McGlothlin, dated 2/1512 have been reviewed by <br />Ronald Thompson, a Mine Engineer experienced in sediment control design and <br />construction and a MSHA certified impoundment inspector, and Charles M~Glothlin, a <br />Registered Professional Engineer in the State of Colorado. Mr. Thompson monitored all <br />phases of construction on a regulaz basis under the direction of Mr.1VI~Glothlin.. <br />This inspection was conducted as required by Section 4.05.6 of the Regulations of the <br />Colorado Mined Land Reclamation Boazd for Coal Mining. As-Built construction details <br />are shown on Survey drawing dated 7/13/2007 as certified by Gary Terry PLS No. 12160 <br />and are hereby incorporated into this Engineering Certification. <br />During construction the Emergency Spillway was moved eastward approximately 200 <br />feet to lie in the center of the north face of the pond. This does not materially affect the <br />operation of the pond. <br />I HEREBY CERTIFY THAT POND 001 WAS CONSTRUCTED IN ACCORDANCE <br />WITH THE ABOVE REFERENCED DESIGN PLANS. FIELD MODIFICATIONS, AS <br />MAY BE NOTED ABOVE HAVE NOT ADVERSELY IlVIPACTED CRITICAL <br />DESIGN CRITERIA FOR POND VOLUME, AND EMBANKMENT AND <br />EMERGENCY SPILLWAY DIlvIENSION. PRIMARY SPILLWAY CONSTRUCTION <br />CONFORMS TO THE ORIGINAL PLAN DIlVIENSIONS DESIGNED AND <br />CERTIFIED BY CHARLES McGLOTHLIN, REGISTERED PROFESSIONAL <br />ENGINEER <br />i <br />~`harles lVI~~rlotlilit~,:~.E._ ~~ ' <br />_ - - ~ ~' <br />' _ _ C __, <br />"~ ~' % 1 <br />:v <br />,~ <br />~~,~'„°~,%t <br />-!~ ~ k <br />~~, ./ . J <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.