Laserfiche WebLink
"' Or U. S. DEPT. OF THE INTERIOR a�P��"�"T°f Ty��ti <br /> ' rnOFFICE OF SURFACE MINING <br /> N A <br /> n � <br /> Mine Site Evaluation <br /> State Program RECEIVED °FSURFAG� <br /> �O.c6 3 18�9 <br /> 1.Permittee/Person 9. Permit NumberDEG 2 <br /> 10. Permit Type <br /> BOWIE RESOURCES LTD C-083-1996 PP �v <br /> 2.Address 11. Field Visit Date Mirtifl u On, 13. SRA Present <br /> P.O.BOX 483 12/OS/2007 O � El3. City 4. State min-dd -yyyy <br /> 14. Permit Status 15. Site Status 16. Facility Type <br /> Paonia CO AP BCDEFG <br /> 5. Zip Code 6. Phone Number 17. OSM Office# 18. CCID# 19. Land Code <br /> 81428 (970)527-4135 140 71 <br /> SF <br /> 7. Operator Name,if Different than Permittee <br /> 20. M.S.H.A ID# 21. State Abrev. 22. County Name <br /> 05-04591 CO DELTA <br /> 8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br /> BOWIE NO.2 MINE <br /> 25. Hours 26. Si ature Block 27. Reviewing Official: <br /> 2,p a. Permit Review ( <br /> S gna ure: 12 l ll0 -7 Signature: <br /> 6.0 b. Site Visit Time HENRY AUSTIN ID#116 <br /> Review Date: ItJ/Tocl7 <br /> 10.0 c. Travel Time Printed Name: mm-dd-yyyy <br /> 2 p d. Report Writing Date: 12/11/2007 Is Supplemental MSE Page Used Y/N <br /> Permit Type -Item 10 IP=Interim Program, PP=Permanent Program, NP=No Permit <br /> Purpose Type Codes Item 12 CCR....Citizen Complaint Referral(non site visit) <br /> pxx....Oversight RFx.... Reclamation Fees CC......Citizen Complaint(initial site visit) <br /> Axx.,..Assistance Fxx.....Federal Actions CCF....Citizen Complaint Follow-up <br /> Joint Inspection-Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br /> Permit Status-Item 14 AB....Abandoned:All surface and underground coal mining activities have ceased and <br /> operator has left the site without completing reclamation as defined in <br /> A.... Active:Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br /> PPermitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed,and. <br /> IN....Inactive(Permanent Program Permit):Phase II completed or reclamation in progress or not yet commenced. <br /> Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br /> Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br /> BR...Bond Release:Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br /> Authority(RA)has released all of thebond(Phase III Release.) NA...Not Applicable:When site is unpermitted. <br /> Site Status Codes-Item 15 NS..Non-Site Visit: Status of site not determined. <br /> ND...No Disturbance:No coal mining and reclamation MC..Mining Complete:No mining activity on site, FP..Forfeiture Pending:The RA is pursuing <br /> operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit,collect the <br /> EX..Coal Exploration:Coal exploration operations TC..Temporary Cessation:The RA has granted performance bond(s),and/or reclama- <br /> have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ performance <br /> of forfeited site is in progress. <br /> have not begun. 817.131(b). FR..Forfeited and Reclaimed: Forfeiture <br /> AP..Active Coal Producing:Coal surface mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br /> activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site:Abandoned site that <br /> AN..Active Non-Producing:Active non-producing permits, partial bond release. is permitted but there is no bond. <br /> facility such as tipple or preparation plant. P2..Phase II Release: At least Phase II bond release WC.Wildcat:Coal mining and reclamation <br /> NM..No Mining: The Permit Status is active,site is for the entire permitted area. operat ns have or are taking place and <br /> io <br /> not in Temporary Cessation,no surface coal P3..Phase III Release: Reclamation completed and the activity is not covered by the <br /> mining activity,and site not regraded. the RA has released all bond. required permits from the RA. <br /> Facility Type Codes-Item 16 D...Ancillary(Haulroad,Conveyor,and/or Rails) H...Exploration Permits L...Remining site permitted <br /> A... Surface E...Refuse and/or Impoundment I...Notice of Intent to Explore under 30 CFR785.25 <br /> B... Underground F...Loading Facility and/or Tipple J...Exempt 16 and 2/3 <br /> C... Preparation Plant G...Stockpi es K...Government Financed Construction Exemption <br /> Small Business Regulatory Enforcement Fairness Act (SBREFA) <br /> Your Comments Are Important <br /> The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br /> small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agenc v's <br /> responsiveness to small business. If you are a small business(a business with 500 or fewer employees including those of affiliates) Page 1 of <br /> and wish to comment on the enforcement or compliance activities of OSM,call 1-888-REG-FAIR(1-888-734-3247). Revi�dDecember4,199s <br />