My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP51479
DRMS
>
Back File Migration
>
Report
>
REP51479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:56:11 AM
Creation date
11/27/2007 1:05:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
7/28/1992
Doc Name
2ND QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_. - • ; iii iiiiiiiiiiiii iii <br />ORCHARD VALLEY MINE <br />,2r~QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />(9~~ <br />Item Y/N Comments <br />i. Quantity of waste material added to N There was no gob hauled to the waste disposal <br />waste disposal area this quarter? pile this quarter. <br />2. Waste material deposited and compacted N Approximately half of the uppermost 12 feet of exposed <br />in 24" lifts? gob has been removed and shipped out. Approximately <br /> half of the exposed gob remains in place. <br />3. Drainage alterations consvucted? N No drainage alterations were consvucted during the <br /> quarter. The etdsting drainage patterns were main- <br /> tained around the perimeter of the exposed gob area <br /> to protect outslopes and direct drainage to ditches at <br /> the toe of the pile. <br />4. Present height of waste material? Highest height approximately 65.'7 feet. <br />5. New bench constructed'? N <br />6. Refuse material outslope placed at Y Slopes were checked for proper placement periodically <br />IV:2H outslope'? during construction. <br />7. Adequate drainage on top of completed Y Di[ches were maintained on [op of the exposed gab to <br />fill? [o ensure proper drainage from [he top of the pile. <br />S. Bench drainage adequate'? Y Bench drainage was maintained throughout the quarter. <br />9. Outslopes covered wi[h d' non-toxic, Y <br />non-combustible material'? <br />10. Berms constructed on outslopes? Y <br />l 1. Evidence of structural defects? i N <br />
The URL can be used to link to this page
Your browser does not support the video tag.