My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP49566
DRMS
>
Back File Migration
>
Report
>
REP49566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:53:32 AM
Creation date
11/27/2007 12:37:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991078
IBM Index Class Name
Report
Doc Date
1/22/1996
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiu iii <br />999 <br />• <br />Notice of Intent to Continue Mining Operations `~'-~~~-iV C <br />110c Construction Materials Annual Report <br />Pe rmittee Name: <br />Permit No. <br />Operation Name: <br />Anniversary Date: <br />Total: <br />1. a. Permitted acreage: <br />xiowa County J~AjN 1 ~ 19//9--6 <br />M-91-078 ,`~C /`, J~['\J <br />Peters Pit+ "l <br />February 04, 1997 _~.,, w.. u...,n i~i~i„ a hcv D~~ <br />$225.00 (Due on your Anniversary Date) <br />b. County where mine is located <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO ~ <br /> Does this mine operate MORE or LESS than 180 days per year? MORE ES <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:+ <br /> <br />5. <br />Total acres reclaimed for the report year:* "~ <br />G <br />6. Total number of acres in topsoil replacement 6tage: U <br /> a. Average thickness of topsoil replaced: ~~A <br />7. Total number of acres seeded: ~~~/ <br /> a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br /> a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic mater ial or soil <br /> conditioners used for the report year:* <br />10. Estimated total acres to be affected in the next report year:+ ~-~ <br />11. COMMENTS: <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate t:he phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: /6~T~.~' Date: ~~ -~7 'r '~ <br /> <br />Please type or print cu;rent contact name, mailing address, and phone number below: <br />Contact Name <br />Company: <br />Address : P.O. BOX 591 <br />Eadg Colorado 81036 <br />Phone: <br />FAX NO: - <br />Federal Tax ID No. or Social Security No.: d 7 ~(P DO U ~ 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.