Laserfiche WebLink
iii iiiiiiiiiiiuiii <br />DEFI~ITY%PERMEABILITY TEST Oid LINE& DOVER <br />PHASE ONE AND TWO <br />SUMMARY <br />10-7-93 <br />TEST LOCATION/DESCRIPTION COMP. PERMEABILITY <br />PHASE TWO, ACRE 1 <br />175" EAST OF MAIN EMB. ABUTMENT 89.9 2.2X10-6(CM;S) <br />D-8 DOZER PLACEMENT ONLY <br /> PHASE TWO, ACRE 8 <br /> 83" SOUTH OF PHASE 1/2 TIE-IN 98.1 1.3X10-6(CM/S) <br /> HEAVY HAUL TRUCK TRAFFIC <br /> PHASE ONE, ADJACENT TO ACRE 40 <br /> 20" NORTH OF PHASE 1/2 TIE-IN 100.0 1.6X10-6(CM/S) <br /> HEAVY TRAFFIC AT CONSTRUCTION <br /> AND LIGHT TRAFFIC DURIP7G OPERATION <br /> PHASE ONE, ADJACENT TO ACRE 4 <br /> 100" NCRTH OF PHASE 1/2 TIE-IN 95.6 ^..9X10-6(CMiS) <br /> INITIAL CONSTRUCTION TRAFFIC <br /> ONLY <br /> PHASE TWO 30' Nth OF ANCHOR <br />TRENCH ACRE 5. 8-INCHES FROM - <br />3.1X10-6(CM/S) <br /> THE SURFACE OF AREA PUSHED <br /> BY DOZER ONLY (NO TRAFFIC) <br />GLENN'6UYER, ^RK S~N/VOft FIELD REPRESENTATIVE <br />