Laserfiche WebLink
<br />III IUIIIIIIIIIIIII <br />BATTLE MOUNTAIN GOLD COMPANY <br />March 4, 1997 <br />RFCE11~'=D ~\ <br />Mr. Jim Dillie entente-M-oun~raN <br />Division of Minerals and Geology (hgj2 ~ 0 f99~ GOLD COMPANY <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 DIVI$IOIIJIoyI1V~LLly,ay~;,Jl~~ll`. <br />Subject: Battle Mountain Resources, Inc. -San Luis Project <br />DMG Permit No. M-88-1 12 <br />Monthly Pond Compliance Report -February 1997 <br />Dear Mr. Dillies ~~ <br />Attached is the February 1997 monthly summary of cyanide analysis performed on samples <br />from the tailings pond and the collection pond as required. TR-O10 specifies a simple <br />monthly average for regulating pond compliance. The January averages are as follows: <br />Tailings Pond 0.30 ppm CN-wad, 0.42 ppm CN-total <br />Collection Pond 0.22 ppm CN-wad, 0.32 ppm CN-total <br />The February simple averages show compliance with our permit standards of 3.8 ppm CN- <br />wad and 4.4 ppm CN-total, Samples collected on February 12 and 25 were sent to <br />Sangre de Cristo Laboratories for outside lab verification. <br />Sincerely, <br />Richard Neu <br />Metallurgical Engineer <br />Enclosures <br />cc: Anne 8aldrige <br />DanRoberfson <br />File <br />P.O. 80X 310 SAN LUIS, COLORADO SI 152 <br />(719) 672-3362 FAX (719) b72-3363 <br />