Laserfiche WebLink
i <br />j0. • III 111111 III IIII III ~ 1. [1#~1 ,,..~1~ ((\ ~S.~~i w <br />rC.vl.~L'\Ct- <br />Canyon Sand and Gravel ~ <br />P.O. Box 4362 6~~~~d~~F" <br />Pagosa Springs, Co. 81147 OCT 1 ~ 2UQD <br />Permit No. M-1488-057 <br />Division of 119inerals and Geology <br />Division of Minerals and Geology <br />Dept. of Natural Resources <br />1313 Sherman St., Rm. 215 <br />Denver, Co. 80203 <br />October 13, 2000 <br />ANNUAL REPORT <br />Canyon Sand and Gravel has worked within the boundarys of the established perimeters <br />this 2000 season. Final reclamation was done on the unfinished northwest corner of the <br />pit . Topsoil was replaced over the finished burin and grass seed was applied. The seed is <br />well started now. A 1 to 3 slope extends from the burin down to the bottom of the future <br />lake and boulders have been placed along the water line. <br />Excavation was done in May to stockpile raw material at the north end. Again in July <br />excavation was done and also the reclamation described above. This week a small <br />excavation will be done to restore the stockpile of raw material to be crushed taking <br />material from the north end of the interior face and some from the south end of the <br />interior face/ i.e. the remaining working area ofthe pit. <br />Now essentially the northern most phase 4 is completed as is the southern phase 1 and <br />phase 2. On the enclosed photo taken in September 2000, the entve pit area and future <br />lake can be seen. <br />By next year Canyon Sand and Gravel will have to stockpile by means of a long stacking <br />conveyor in an area outside of the perimeter of the pit/lake which is designated in the <br />permit by the dotted line at the northwest end of the pit boundary. Because of logistics <br />with the current state of the operation, phase 3 being the final phase, location of this area <br />needs to be moved to the area just north ofthe road leading into the pit. The same size <br />area would be used as the previously designated area in Permit M-1988-057, for the <br />stockpiling of sand which has not been needed. Topsoil will be scraped back and added <br />to the top soil piles already in waiting for the areas that need final touches when the <br />project is finished. This top soil supply is located next to the recently finished NW <br />section of burmed pit boundary, and will be on immediate site to reclaim the stockpile <br />area. <br />Enclosed annual fee of $281.00 <br />