Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />BATTLE MOUNTAIN RESOURCES, INC. <br />September 30, 1993 l~~ <br />a3. <br />~)v ,;;,r R 199.? <br />Mr. Larry Oehler ~~ <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 Tp ~n NN <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-SB-112 <br />Monthly Pond Compliance Report - August 1993 <br />Dear Mr. Oehler: <br />Attached is the August 1993 monthly summary of cyanidle <br />analysis performed on samples from the active pond, the <br />inactive pond, and the collection pond as required by the <br />approved TR-010. <br />As outlined in TR-010, daily samples of the active pond and <br />the collection pond are analyzed on-site. A weekly sample of <br />the inactive pond is also analyzed on-site. TR-010 specifies <br />a simple monthly average for regulating pond compliance. The <br />August averages are as follows: <br />Active Pond <br />Inactive Pond <br />Collection Pond <br />1.19 ppm CDP-total <br />0.59 ppm CN-total <br />0.67 ppm CNi-total <br />1.00 ppm CN-wad, <br />0.53 ppm CN-wad, <br />0.49 ppm CN-wad, <br />The August simple averages show compliance with our permit <br />standards of 3.8 ppm CN-wad and 4.4 ppm CN-total. <br />Samples collected on A <br />Lab tories for outsi <br />reports from Core a s <br />3 and 21 were sent to <br />are enclosed. <br />ysis <br />If you have any questions, please call. <br />Sincerely, <br />~Wnn ~ ~~` <br />Alana L. Scott <br />Environmental Engineer <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />A SUB SIDIAHY OF BA77/ F ~f0(/NIAIN G(1/ I1 COMVANY <br />P.O. BOX 310 SAN LUIS, COLORADO ril I5~-0310 1719) 67?-376? FAX (719) fi7? 3363 <br />