<br />Globe Hill 199 <br />~ ^iii iiiiiiiiiiiaiii <br />999 <br />Grading of this overburden stockpile site was accomplished in early 1997, using <br />CCS~V's equipment. Reclamation work began on this site in March of 1997 and was <br />completed in early May 1997. 1996 Standard Site Seed mix (see attachment 7) was <br />hand broadcast at a rate of 1 bag per acre. Fertilizer was applied at a rate of 108 <br />Ibs/ac Nitrogen, and 276 Ibs/ac Phosphorus and no Potassium. Mat Fiber Plus mulch <br />was applied at a rate of 2500 Ibs/ac. The Nitrogen and Phosphorus were applied with <br />the mulch. Biosol (6N-1 P-3K) was applied at a rate of 1500 Ibs/ac by the hydromulcher <br />on approximately 4 acres at the bottom of the hill where soil was deemed less <br />productive. Work was completed by CC&V Team Members and Conley Construction. <br />