Laserfiche WebLink
999 <br />BATTLE MOUNTAIN GOLD COMPANY <br />January 12, 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report - <br />Dear Mr. Oehler: <br />94fILE MOUNTAIN <br />GOLD COMPANY <br />- San Luis Project <br />January 3-9, 1993 <br />Attached is a summary of the daily on-site cyanide analysis <br />performed on samples from the active (upper) pond and the <br />collection pond during the week of January 3-9, 1993 as <br />required by the approved TR-010. <br />The active (upper) pond averaged 1.67 ppm CN-wad and 2.47 ppm <br />CN-total. The collection pond averaged 2.65 ppm CN-wad <br />and 4.12 ppm CN-total. The weekly sample of the inactive <br />(lower) pond, collected on January 6, showed 0.63 ppm CN-wad <br />and 2.82 ppm CN-total. <br />Samples collected on January 8 were sent to Core Laboratories <br />for outside analysis verification. <br />If you have any questions, please call. <br />Sincerely, <br />Alana L. Scott <br />Environmental Engineer <br />Enclosures <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br /> <br />JAN 151993 <br />G~ <br />M~NERh~~ <br />P.O. BOX 310 SAN LUIS, COLORADO 81 I S? <br />(719) 67?-316? FAX (719) 672-3763 <br />