Laserfiche WebLink
FAX N0. 17198464975 Jan. 18 2006 09:50AM PS <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2] <br />Mine: Raton ~ <br />Waste Bank MSIi, <br />Inspection Period: <br />Inspection Date: <br />General Description or Reference to Site Plan: <br />Raton Creek Mine is in final reclamation. All required structures have keen removed, <br />the area brought to final grade, mulched and seeded. <br />Orainage: (Discussion of springs. seeps, overland and channel flow, underd2in construction <br />and/or discharge, integrity of 100 yr 24hr drainage structures, and evidence of positive drainage). <br />Observation of Fill Construction: (Description of material, compaction, I"ift thicknesses, <br />slopes, and construction methods). <br />Structure has been completed bo final grade. No additional material placement has occurred <br />this quarter nor is anticipated. <br />Page 1 of 2 <br />