My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP47315
DRMS
>
Back File Migration
>
Report
>
REP47315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:50:52 AM
Creation date
11/27/2007 11:57:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Report
Doc Date
7/29/1987
Doc Name
ASSOCIATED AGGREGATES INC WALSTRUM MINE PN 83-33 ANNUAL REPORT
From
ALBERT FREI & SONS INC
To
MLRB
Permit Index Doc Type
ANNUAL FEE/REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.4SSOCIAYIED ~,G OG~.YES, IP ~II ~I~~I~~I~~~~~~I~ RALO FICES AND PLANT <br />QUARRY sss 3RIGHTON ROAD a HENDERSON, COLORAD060640 <br />Q (303)289-3316 <br />PIT LOCATION <br />33501 STATE HWV.6 IDAHO SPRINGS, COLD 80452 <br />(303)571-5164 <br />June 12, 1987 <br />Mr. Mark Loye <br />Colorado Mined Land Reclamation Board <br />1313 Sherman Street, Suite 423 <br />Denver, Colorado 80203 <br />Dear Mr. Loye, <br />Re Associated Aggregates, Inc, <br />Walstrum Mine, M.L.R. Permit <br />No. 83-33, Annual Report <br />Our files indicate that the anniversary d <br />June 23. Operation continued as approved in the <br />Construction of the entrance road is complete <br />on the rest of Stage 1. Please refer to the <br />~~~ 2 g 1997 <br />F1tINE0 ~D ~g1O~ <br />REC-~`~ATIO~ <br />ate for this permit is <br />July, 1985 Amendment. <br />and mining has begun <br />Annual Report map for <br />the locations of areas discussed in this report. <br />We will deal specifically with each of the Annual Report <br />questions as outlined in Section 2.41 of the Rules and Regulations. <br />2.41 (1) Construction of the entrance road in Stage 1 has continued <br />this year. We stripped 3.71 Acres ± this year, to date <br />6.36 acres ± is stripped and prepared for mining (brown). <br />We increased the mined area by 1.73 acres ± (yellow), on <br />land stripped and prepared for mining last year. Total <br />disturbance to date in Stage 1 is 10.77 acres ±. Stages <br />X and Y are still in use; with backfilling in Stage X <br />still continuing. Storage of growth medium continued on <br />Stage A this year. The processing plant has been moved <br />in to the mine consistent with the approved plan. <br />(2) No reclamation was required during this time period. <br />(3) Backfilling is the only reclamation performed. Partial <br />backfilling has continued in Stages X and Z (blue). <br />(4) Not applicable. <br />(5) Not applicable. <br />(6) The backfilling has been successful. <br />
The URL can be used to link to this page
Your browser does not support the video tag.