Laserfiche WebLink
-. ! • <br /> III ~II~II~II~~II I <br />999 II <br />~ECEIVED <br />Notice of Intent to Continue Min ing Operations F <br /> 112c Construction Materials Annual Report <br /> C <br />Utl' 0 ~ 1996 <br />Permit No. M-88-090 <br />Operation Name: Deer Trail Pit <br />Anniversary Date: December 07, 1996 <br />Annual Fees for the Year (s) : 1995 - 1996 DiViSiOn v. ivuabi pia ~. ~~~: .:~a~,;Y <br />Total: $550.00 (Due on your Anniversary Da te) <br /> <br />1. a. Permitted <br />acreage: <br />~S~ b. County <br />where mine is tltl y(/~ <br />located: ~ n ~ `~LS~, <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br /> Does this mine operate MORE or LESS than 180 days per year? MOR LESS <br />3. Does this mine have a phased reclamation plan? YES NO ~~ <br />4. Total acres affected during the report year:* 9 /CS-~°".S <br />5. Total acres reclaimed for the report year:* g l~s <br />6 . Total number of acres in topsoil _renlacemenr_Ftage~:- - - - - -~-f.~-S - - <br /> ~~ <br /> a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: e S n e ~~ <br /> a. List species seeded & seeding rate for report year on back /~/zxl ~G~'H,S- <br />8. For non-phased operations provide dates extraction ceased: ~ <br /> <br />a. Date reclamation began: ^/ <br />/l' ~~ <br />9. The type and approximate quantity of fertilizers, organic <br />ma terial or soil, <br /> T <br />conditioners used for the report year:* D e ~~II I .2 ohl <br />10. Estimated total acres to be affected i <br />n the nex <br />report year <br />t : <br />* <br />. ~ ~ /y~~pl~ <br />11. { <br />~ <br />~ <br />C~IENTS: ~~ jl~Gl, ~/~~'c~9P ,(-~b,~(~ /YQYr y?A /7, / <br />1 <br />1.: o1.0eN5,~~5/d <br />2 e~ <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTB: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: Date: ~ ~ ~ Z ~ ~~ <br />Please type or print c ent contact name, mailing address, and phone number below: <br />Contact Name: ~,~.~~~ ~ ~"'7~~y Phone: (~~) G~~-p yP~ <br />~/ _~'7 _ FAX NO: (.SO.~) G~.t~ YS S.3 <br />Company: %~' ~'C ~`il ! ~ lg, ,~ ~C= <br />Address: ,~n/ ~/ e 5` <br />l~tpo nom.-~.~ Qo Cp~ <br />Federal Tax ID No. or Social Security No.: R 7 ~ / / 1 ~n aJ~ <br />0 <br />