Laserfiche WebLink
~i <br />III IIIIIIIIIIIIIIII <br />899 <br />RECEIVED <br />NOV ~2 1998 <br />^~vision of Minerals & Geology <br />October 30, 1998 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />weekly Pond Compliance Repo~:t <br />October 25 - October 31, 1998 <br />Dear Mr. Dillie:_ <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of October 25 <br />- October 31, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.021 ppm CN-wad and 0.788 <br />ppm CN-total. The collection pond averaged 0.021 ppm CN-wad and 0.022 <br />ppm CN-total. <br />Sincerely, <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />