My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP42910
DRMS
>
Back File Migration
>
Report
>
REP42910
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:44:54 AM
Creation date
11/27/2007 9:44:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985085
IBM Index Class Name
Report
Doc Date
4/13/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~c~; "Z 7j ~ <br />III IIIIIIIIIIIIIIII • `k ~ ~z °, <br />999 <br />Notice of Intent to Continue Mining Operations RECEIVED <br />112c Construction Materials Annual Report <br />Permittee Name: Gary Boyce APR 1 3 1998 <br />Permit No. M-85-085 <br />Operation Name: Rancho Rosado* Divisi0no(Mi <br />Anniversary Date: April 17, 1998 ne~~8 G¢OlOgy <br />Total: $550.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: ~ b. County where mine is located: ~RCfGU/~GE/F <br />2. <br />3. <br />- 4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10 <br />11 <br />Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 180 days per year? <br />Does this mine have a phased reclamation plan? <br />Total ac res_af£ected during the repo r.t year:'_ _ <br />Total acres reclaimed for the report year:' <br />Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />YES I . <br />MORE LESS <br />YFG NO <br />Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />Estimated total acres to be affected in the next report year:* (J <br />COMMENTS: AlO MAP Fi~/ljiGUSL7 '~ ~/.V Fc NOS /Yd~/I//~ <br />.C f-'ST YF~ <br />" Please show the location of the acreage for items 4 - F on your map" . indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />" NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above.n / r ~/ <br />Signatur Date: ~~/~/4ic C/-f l! ~ O <br />Please type or print current contact name, mailing address, and phone number below: <br />contact Name: ~ Df-fN ~/~ / % ~- Phone: (~/~/) ~-SG ' y~ 1 C/ <br />Company: /^c~n.L /C. ~S~D O <br />Address: ITJ~ S ~i ~i <br />C~GS!ONC ~ • o [[~I <br />Federal Tax ID No. or Social Security No.: SL / <br />FAX NO: ( ) <br />_~o-SC~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.