Laserfiche WebLink
<br />III IIIIIIIIIIIIIIII <br />999 <br />QUARTERLY INSPECTION REPORT <br />CQAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />Mine <br />S <br />Waste Bank <br />V <br />General Description or Reference to Site Plan: <br />^/Golden Eagle - Exhibk 17, pages 2.05-19, 2.05-25 (a) through (c) <br />y4 New Elk • Exhibit 3D, pages 2.05-27 through 2.054 <br />Activity During Inspection: , <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surface Drainage System <br />0 <br />^ Placement of Underdrain(s)' <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year24-hourappurtenant drainage structures, evidence of positive <br />drainage. <br />No SPr';.,ss or' 4 n~qs os,Q Qrt/ vG S et°p~~g t°_ <br />Nt~ o ~Serued, <br />Arco 4Pcsz~~ ~o ~iv~ S4~'ci~nr- aPr~;n4Se, <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />~ ~' rece~l't/y P~Q~~°~ ~°,'/l n,o~ o~ ,nspe~ ~%o~, <br />w9s /lo7r Co~ttn~/~ olwrin~ <br />oP9~ July ~o, ~PfB <br />~/9~c~„c~t , it s~av(~ be Pn'Pery co~ip4c~ <br />