Laserfiche WebLink
_{ <br />iii iiiiiiiiuiii iii <br />999 <br /> <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />~~, (,~c. Zq~ Jgq°l <br />Mine:~e6./ ~~1~ <br />Date: <br />Waste Bank No: K ///F <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2,05-19, 2.05-25 (a) through (c) <br />~ew Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surtace Drainage System <br />^ Placement of Underdrain(s)" <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year 24-hours purtenantdrainagestructures,evidenceofpositive <br />drainage. /I(0 SP/"i/I~S dr4/'P_4S o~4c~;/e Sec~9e. i„ti°r~obserr~m/. r°rL°v"s~ <br />4~~v5 o-F'olise~~roP se ge q~PeQ~ dry. Dvera// Sur{a'ce ~Pca,'~,ye <br />~rP~rs ~m~ ~'~,P~ ~/ir 7~e ca2~q /I~rtr y-~~ ~.,>~s~oP/A1r o.~, nGe kPPer <br />1~~g1 wl~~r•~ a dly,c~i1/S;/~~%~+• ~prounoP/n..~.gxer~.~,e4/su~Hr~.,~Sc+~o no7~ <br />irloe~~Cq}~GC~/`OanoP+~4yCfaL(il~ilP inYt9 ~L°!~'i.~Se 4~"t/~L° M'x~rti'YDi','n, f19in~S <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />Seve/'a / ~~ lrs a~ ~xrr ~hd Svtdsl`+~,~ crerc o~/vco/ m., 7~G 4~~r <br />level. 77,~eG Yv s;,r l.,c~ ~'~/c !od ~c~, P/vcr~ ~'•c/~~ s-hv// <br />SIuM p g6Ovc ~+e 7~: ~~ be~c1,. <br />Job No. 28,170 Page 1 of 2 <br />