My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40692
DRMS
>
Back File Migration
>
Report
>
REP40692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:34:41 AM
Creation date
11/27/2007 8:48:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977163SG
IBM Index Class Name
Report
Doc Date
11/6/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; ~ III IIIIIIIIIIIIIII • c~ /~ <br />Notice of Intent to Continue Mining Operations ~~ ~~~ <br />112c Construction Materials Annual Report ~ ~^^~ <br />Permittee Name: Lincoln County 1 oO~! <br />Permit No. M-77-163-SG RECE <br />Operation Name: Fisher Pit 11/E® <br />Anniversary Date: November 21, 1998 <br />Total: $550.00 (Due on your Anniversary DaG6J~ ~ B 1998 <br />1. Contract Dates: (for 111 permits only) Beginning date: N ~A <br />Completion date: -~ <br />2. a. Permitted acreage: 36'9 b. County where mine is located: L1riCOlri <br />3. Has this mine been granted TEMPORARY CESSATION STATUS? YES O' <br />4. Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />5. Does this mine have a phased reclamation plan? - YES NO <br />6. Total acres affected during the report year:+ 12 <br />7. Total acres reclaimed for the report year:* 0 <br />e. Total number of acres in topsoil replacement stage: 2 <br />a. Average thickness of topsoil replaced: 6 inches <br />9. Total number of acres seeded: 0 <br />a. List species seeded & seeding rate for report year on back <br />10. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:+ 0 <br />12 <br />11. Estimated total acres to be affected in the next report year:+ <br />lz. co~terrrs: Attempts to reclaim an additional 2 acres of affected area <br />so a conversion to a 110 permit could be requested. Map unnecessary. <br />No changes since last annual report. <br />* Please show the location of the acreage for items 4 - 6 on your map*+. Indicate the <br />phases of the reclamation which have been completed, correlated with your timetable. <br />+* NOTB: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />signature: ~~~ ~~i ~~.~ Date: November 3, 1998 <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: <br />Pete Aragon <br />Phone: (719 (743-2337 <br />FAX No: r 719 X743-2838 <br />Home: 719- 446-5359 <br />Company: <br />Address: <br />Lincoln County <br />P.O. Box 67 <br />Hu4o, Colorado 80821 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.