Laserfiche WebLink
~. ~,,,. iii iiiiuiiiiiii iii <br />STATE OF COLORADO <br />• MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman $t., Room 215 <br />Denver. C080203 <br />303 8663567 <br />FA%:303 032-8106 <br />February 28, 1990 <br />Southway Construction Company <br />117 White Pine <br />Alamosa, CO 81101 <br />112 Annual Fee Letter <br />\~~ <br />~ ~~a~ <br />t~ <br />pF' COQ <br />e~ r A~^ ~~ <br />10 <br />.1'.. ~ ..,, . <br />~ /B ]6]6 ~ <br />Roy Romer <br />Governor <br />Fred R Bania <br />Dnrsron Dnecror <br />In order to maintain your mining operation in compliance with the law, the annual <br />fees, report, and map required by C.R.S. 34-32-116(3) and (4) must be submitted <br />annually on or before your permit anniversary date. Fees are based upon a <br />schedule of 1350 if the operation is an open mining operation and 1275 for any <br />other operation. Division records indicate you owe 1350.00. <br />Permi t No.: <br />Operation Name: <br />Anniversary Date: <br />• Annual Fees for the Year(s) <br />Total: <br />M-87-012 <br />King Pit <br />05/27/90 <br />1990 <br />1350.00 (Due on the Anniversary Date) <br />IF THE ANNUAL FEES AND ANNUAL REPORT ARE NOT RECEIVED ON OR BEFORE THE <br />ANNIVERSARY DATE, A CIYIL PENALTY IN THE AMOUNT EOUAL TO THE ANNUAL FEE AMOUNT <br />WILL BE AUTOMATICALLY ASSESSED AND WILL BE DUE AND PAYABLE WITHIN THIRTY (30) <br />DAYS FROM THE ANNIVERSARY DATE. <br />If your records indicate different facts than those stated above, please inform <br />this office as soon as possible, otherwise, we will expect to receive the annual <br />fees as required by the statute on or before your anniversary date. Also, <br />please include the required Notice o n en to Continue Mining Operations <br />(Annual Report to bring the Division up-to-date as to the progress of mining and <br />reclamation on the site) and the map. If you cannot include these materials with <br />the fees, please indicate on the enclosed sheet how soon we should expect to <br />receive the material. <br />Submittal of a report and map (to a scale of not less than 100' to the inch and <br />not more than 660' to the inch), indicating the phases of the reclamation plan <br />which have been completed and correlated with the timetable is reouired. The <br />report and map shall contain the following information: <br />1) Location and number of acres affected during that year; <br />• 2) locations and number of acres reclaimed for that year; <br />