My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40680
DRMS
>
Back File Migration
>
Report
>
REP40680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:34:16 AM
Creation date
11/27/2007 8:48:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
9/6/1991
Doc Name
MEMO-AUGUST MONTHLY OPERATING REPORT
From
J C LENZ
To
G C DODSON
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ • iii iiiiiiiiiiiii iii <br />999 i <br />September 6, 1991 <br />To: G.C. Dodson <br />From: J.C. Lenz <br />Subject: August Monthly Operating Report <br />Mill Operations <br />1.1 Crushing <br />Approximately 114,275 wet tons of ore were crushed <br />in August. Operating availability of the primary <br />crusher was 85.2$. Throughput was restricted by the <br />poor condition of conveyor CV-O1. Installation of <br />impact saddles changed the required specification <br />for the conveyor belting and rendered the existing <br />belt to be below the new specification. The belt <br />deteriorated rapidly and an order was placed for a <br />higher quality belt. Installation of trie new belt <br />will occur in September. <br />1.2 Grinding <br />124,379 dry tons of ore were ground during July. <br />Operating availability of the plant increased to 88.60$ <br />this month. Average plant throughput for the month <br />increased to 189 tons per hour. Major downtime was caused <br />by replacement of broken SAG mill liners, revulcanizing <br />CV-02, and dressing the ball mill ring and pinion gears <br />due to metal migration. <br />The thickener was put on line near mid-month. The slow <br />settling characteristics of the East Pit ore required <br />high flocculent use. The modifications made to the <br />thickener circuit have been successful and the thickener <br />is operating well. A liquid flocculent evaluation <br />
The URL can be used to link to this page
Your browser does not support the video tag.