My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP39742
DRMS
>
Back File Migration
>
Report
>
REP39742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:27:22 AM
Creation date
11/27/2007 8:31:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Report
Doc Date
6/23/2000
Doc Name
QUARTERLY INSPECTION REPORT COAL WASTE BANKS RULES 4.09(11) & 4.10(2)(2)
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~r : III IIIIIIIII IIII III <br />~ r 999 <br />~~y <br />'r 1 <br />QUARTERLY INSPECTION REPORT <br />'" COAL WASTE BANKS RECEIVED <br />~~~ <br />Rules 4.09(11) and 4.10(2)(2) JUN 23 2000 <br />n /P~/ ~/ /. Division of Minerals 8 Geology <br />Mine: ~ (( K - - - - - - <br />Date: S~~S(GnY' d- ~~d( ~uo/~,e/' , ~"©DO <br />Waste Bank No: /C~/T - <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />New EIk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surtace Drainage System <br />^ Placement of Underdrain(s)' <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year24-hourappurtenant drainage structures, evidence of positive <br />drainage. ee <br />(o~Gtipdi'.t/tt~°~' rtL°~S4/'~?P~7`s of0 ifo-7`' %n~iCQ'fe9rtrinol~w7~w~ <br />by;(al4 p i~ ~!e ~e~ s e ~ sec T61~ ~), -Secf~9~ `"mss .,°~` <br />0 6SC/-v ~ i~ ~ S•~Q l/ S~4a,P a6ov~ 't~e 7`~1~~ .~~^c h . <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />No Q,,P~I;~;o~aj ~l~ gpP~~s ~ l1a~e 6~ Plgc~~ <br />Job No. 28,170 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.