My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP39074
DRMS
>
Back File Migration
>
Report
>
REP39074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:24:26 AM
Creation date
11/27/2007 8:17:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Report
Doc Date
11/2/1995
Doc Name
SUBSIDENCE REPORT 1ST HALF 1995 GOLDEN EAGLE MINE C-81-013
From
DMG
To
BASIN RESOURCES INC
Permit Index Doc Type
SUBSIDENCE REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIIIIIIIIIIIIIIIIII • • ~`~"' <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depa+lmem of Nalco dl Rv.uiuc r. <br />1713 Sherman $I . Ruum ! I + IIF~I~~ <br />Denver, Cnlrnad„ }411704 II <br />Rhnnc (]071 ROb 1547 <br />FAX: 0031 R}!-RIUL <br />DEPARTMENT OF <br />November 2, 1995 NATURAI. <br />RESOURCES <br />Rny Romer <br />Gu.ernw <br />Mr. Ralph Lopez L~me.s ~«nr,e,,d <br />C.cC Ulnr D~~ec vir <br />Basin Resources, Inc. ~,~ naJB.l„~~ <br />14300 Highway 12 p.„.,,,,, p„c., ,n~ <br />Weston, CO. 81091 <br />RE: Subsidence Report, 1st Half 1995, Golden Eagle Mine, ~C-81-013 <br />Review of responses dated October 3, 1995 <br />Dear Mr. Lopez: <br />The Division has completed review of Basin's responses dated <br />October 3, 1995 to the Division's questions pertaining to the first <br />half 1995 Subsidence Report for the Golden Eagle Mine. I have <br />responded as per the original question number. Please respond to <br />the following issues within 30 days of receipt of this letter. <br />1. This response was adequate but this information needs to be <br />incorporated as part of the subsidence report itself rather <br />than as a response to our question. On future reports, please <br />include this information as part of the subsidence report. <br />2. Map 17 should depict topography for future subsidence reports. <br />3. Response accepted. <br />4. For future reports, include the explanation of columns, <br />Elevation Difference, Diff. between Monuments, and Difference, <br />possibly as a footnote to the tables. <br />5. Response accepted. <br />6. Response accepted. <br />7. Response accepted. <br />8. Response accepted. <br />9. Please be aware that permit conditions which specify more <br />frequent monitoring than quarterly are required to be reported <br />in the semi-annual submittal of subsidence data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.