Laserfiche WebLink
ii iiiniiiniu iii , • <br />' Notice of Intent to'Continue Mining Operations ~ECE11/EC <br />112 Annual Report ' <br />SEP 2 ~ ]993 <br />Permittee Name: Robert V Mayne <br />Permit No: M-a7-074 O'!'!°~cnC•1e,~ <br />Operation Name: Dotsero Quarry e~O= s tiec.c , <br />Anniversary Date: 10/09/93 <br />Total: 8550.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES ~ l` <br />Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />2a. Financial lJarranty: S /5, ~'D '~ 2b. Permitted acreage: <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* ~e <br />5. Total acres reclaimed for the report year:* CO"'^'"0"'~ <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: ~ d. Topsoil replaced: ~+,.,-„~ <br />b. Graded: _.,_~ Average topsoil thickness <br />c. Seeded: jGA-c_,2~s replaced: <br />List species seeded & seeding <br />rate for report year en back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />a <br />9. <br />* Please show the location of the acreage for items 4 - 6 on your map*`. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** N~IE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, you must state this fact above. <br />Signature ~ (/ 1~2o~-~.v Date: 9/~~y3 <br />Please type or print1cu/rrenJt convltact name, mailing address <br />Contact Name: K~l~e,e/ ~/i,4~a/P / Phone <br />Company: r/~A+r,/e f~~eelC _ <br />Address: (3vp[ x 7C~ __ <br />~.,A~ S H ~, , ~ . Yid 7 <br />and phone number below: ~ <br />(.~o ~ S,~if- ~ 7.3.s <br />Federal Tax ID No. or- Social Secrrity ^!~_.: ~y-~~8~3~~7 <br />~~ <br />Estimated total acres to be affected in the next report year:' <br />