BATTLE MOUNTAIN RESOURCES INC SAN LUIS DMG PN M-88-112 TAILINGS AREA CONSTRUCTION ACTIVITIES WEEK OF
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ III IIIIIIIIIIIIIIII ~, <br />BATTLE MOUNTAIN RESOURCES, INC. <br />(0: <br />November 8, 1993 ~~ ' I-' '"'` <br />Mr. Larry Oehler <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, <br />DMG Permit No. M-88-112 <br />Tailings Area Construction <br />Week of November 8, 1993 <br />Dear Mr. Oehler: <br />t~ p, %(~ e r1~ <br />'`P~u rr( -En LIDO <br />~f~ <br />fl~iilE MOUNTAIN <br />c D COMPANY <br />Inc. (BMRI) - San Luis <br />Activities <br />During the week of November 1, 1993, construction activities <br />were limited to final preparation of the compacted soil <br />liner along the East dike, completion of the synthetic liner <br />installation, placement of liner cover material on the North <br />dike, and stockpiling of liner cover material in the borrow <br />pit. Jim Dillie inspected the site on November 3. <br />Due to delays in the project schedule, construction <br />activities will be required during early winter weath r <br />conditions. A memo addressing the Division s concern on <br />cold weather construction activities is enclosed. <br />Additional laboratory permeability testing of the lin r <br />cover material has been completed and is enclosed. T~e lab <br />data indicates that the drainage blanket will perform as <br />intended. <br />Settlement marker information is enclosed. The markers <br />continue to be surveyed daily. <br />The following is a summary of construction activities for <br />the week of November 8, 1993: <br />-Continue stockpiling and placement of liner cover material <br />on the north side of the facility. <br />-Prepare roadways for Caterpillar Model 777 hauling of <br />embankment fill material. <br />-Resume construction activities for the main embankment. <br />Sincerely, <br />~Ma~ ~~ <br />Alana L. Scott <br />Environmental Engineer <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />.1 SURSlD1ARY OF RATTLE MOUM'AlN GOLD COAIPANY <br />P.O. BOX 310 SAN LUIS, COLORADO RI 152-0710 (7 191 672-7 762 FAX (719) 6723363 <br />