Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />E <br />S Coal Company Seneca Coal Company <br />RECEIVED <br />JAN 0 21997 <br />December 30, 1996 <br />DIYISiOn ut w,aw(.f11 3 lidJl09y <br />Mr. Harry Ranney <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II Mine - Wadge Highwall Drainage Fill <br />Dear Mr. Ranney: <br />Attached please find a copy of the fourth quarter inspection <br />report for the above-referenced fill. Reclamation grading had <br />been deferred in the West Wadge Pit due to the conditions of <br />Technical Revision No. 16. The west Wadge Pit has been graded <br />for the most part with some final grade and drainage work, and <br />stockpond construction to be completed next year. Two areas on <br />the highwall side and portions of the drainage bottom require <br />some maintenance repairs. This entire inspection area should be <br />completely reclaimed by the end of the next reclamation season. <br />if you have any questions, please call me. <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Attachment <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 ~ FAX (970) 276-3014 <br />