Laserfiche WebLink
iii iiiiiiiiiiiuiii <br />999 <br />April 16, 1997 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RECEIVED <br />~'K 211997 <br />DNIiIOfI 01 nu06~0i6 ti (i8010~ <br />,., x <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />April 6 - April 12, 1997 <br />Dear Mr. Dillie:~ <br />Attached is a sum(((//////VV////m//////allllYY~~~-''~~~r~~y of the daily on-site cyanide analysis performed on <br />samples from the tailings pond and the collection pond during the week <br />of April 6 - April 12, 1997 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.27 ppm CN-wad and 0.07 ppm <br />CN-total. The collection pond averaged 0.16 ppm CN-wad and 0.29 ppm CN- <br />total. <br />Sincerely, <br />~~ ~vG~ <br />Ron Zumwalt <br />cc: Anne Baldrige <br />Dan Robertson <br />