Laserfiche WebLink
. ~ III IIIIIIIIIIIII III ~ <br />BATTLE MOUNTAIN RESOURCES, INC. <br />October 18, 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology - ~ <br />1313 Sherman Street, Room 215 ~. <br />Denver, Colorado 80203 7iocMOUNrowAN" <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luis <br />DMG Permit No. M-88-112 <br />Tailings Area Construction Activities <br />week of October 18, 1993 <br />Dear Mr. Oehler: <br />During the week of October 11, 1993, construction activities <br />were limited to final shaping of the East dike, rough <br />spreading of liner base material on the east slope, <br />placement of approximately 2 acres of liner cover material <br />on the North dike, and stockpiling of liner cover material <br />in the borrow pit. The liner contractor was off-site. An <br />interim construction report was prepared for the Division. <br />Both the Division and BMRI continue work towards bringing <br />on-line a third party construction monitor. Jim Dillie <br />inspected the site on October 15, 1993. <br />The following is a summary of construction activities for <br />the week of October 18, 1993: <br />-Complete the final shaping and liner base material <br />placement for the East dike area. <br />-Continue stockpiling and placement of liner cover material <br />on the north side of the facility. <br />-Weather conditions pending, the liner contractor will <br />tentatively resume activities on October 22. <br />Settlement marker information is enclosed. <br />continue to be surveyed daily. The survey <br />that the tailings are extremely stable with <br />settlement. <br />If you have any questions, please call. <br />Sincerely, <br />~0.na~ ~~ <br />Alana L. Scott <br />Environmental Engineer <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />The markers <br />results indicate <br />no differential <br />A SURSIDIAR)' OF lNTI LC AIOUhTAIN GOLD COMYA.vY <br />P.O. BOX 310 SAN LUIS. COLORADO RI 152-0310 1719) 672 336'_ FAX (719) 67L3363 <br />