My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35328
DRMS
>
Back File Migration
>
Report
>
REP35328
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:12:33 AM
Creation date
11/27/2007 7:05:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
Report
Doc Date
7/23/1993
Doc Name
NOTICE OF INTENT TO CONTINU MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />`H~,~cIV~i_' <br />Notice of Intent to Continue Mining Operations <br />~~ <br />112 Annual Report ~ 3 ~99~ <br />~Ur , a~~ a~ <br />Permittee Name: Asphalt Paving Company <br />Permit No: M-74-086 <br />Oiv~sio.~ufvuner~,, <br />,,U~;~ <br />Operation Name: Ralston <br />Quarry ,uyt <br />Anniversary Date: 07/24/93 <br />Total: $550.00 (Due on your Anniversary Date) <br /> <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO / <br />Does this mine operate MORE or LE55 than 180 days per year? MORE LESS <br />2a. Financial Warranty: $46,650.00 2b. Permitted acreage: 207 <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* 2 <br />5. Total acres reclaimed for the report year:* 1 <br />6. Total acres in various stages of reclamation:* <br />a. 8ackfilled: 1 This Period d. Topsoil replaced: 0 This Period <br />b. Graded: 1 Average topsoil thickness <br />c. Seeded: o ~~ ~~ replaced: <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year :• NIA <br />8. Estimated total acres to be affected in the next report year:* 2 <br />9. COMMENTS: Since it is a quarry there is a time delay between disturbance <br />and re-seedine. <br />* Please show the location of the acreage for items <br />Indicate the phases of the reclamation which have been <br />your Ttimetable. <br />** NOTE: If there have not been any changes since the <br />previously submitted a map which correctly depicts the <br />through 6, then a new map is unnecessary. However, yo <br />4 - 6 on your map**. <br />completed, correlated with <br />last annual report and you <br />current acreage in items 2 <br />~ must state this fact above <br />Si nature: L-* Date: <br />Please type or print current c tact name, mailir}g address, and phone number be pw: <br />COntdCt Ndme: Robert K. Bis7tard // Phone: (303 >279-6fi11 <br />COmpdny: Asphalt Paving Co. <br />AddreSS: 14802 W. 44th Avenue <br />Golden, Colorado 80403 `C~~ <br />Federal Tax ID No o• Socla' Security tic <br />
The URL can be used to link to this page
Your browser does not support the video tag.