Laserfiche WebLink
111111111IIIIIII III • ' ff-pft999 <br /> STERLING READY-MU( CONCRETE CO. e �U <br /> STERLING, COLORADO 80751 /y <br /> December 11, 1997 <br /> R�Cri1�-� <br /> Division of Minerals and Geology DEC19 <br /> Minerals Section j997 <br /> 1313 Sherman Street Suite 215 <br /> Denver, Colorado 80203-2273 DiviciPnofMinerafsdt .,,�py <br /> Gentlemen: <br /> Re Report (112) <br /> MLR No. M-86-147 , Harley Pit I <br /> Anniversary Date: 12/02/95 00-00%^ <br /> FEDERAL TAB IDX 84-0614537 <br /> This pit HAS NOT been granted a Temporary Cessation, and it <br /> HAS operated more than 180 days this year. The Financial War- <br /> ranty for this operation is $20, 300. 00; the permitted area is in <br /> Logan County; covers 38 . 00 ac. ± and the pit is not phased. As <br /> required in Rule 1. 6 the MINEPERMIT SIGN is at the entrance to the <br /> pit and the boundary has been outlined with posts to delineate <br /> the affected lands. Mining continued as approved in the conver- <br /> sion application completed in 1996. <br /> The annual report requirements in the MLRB Rules and Regula- <br /> tions, and the annual review letter are addressed in the follow- <br /> ing report. Please refer to the enclosed ANNUALREPORT MAP for <br /> areas discussed in this report. <br /> (1) We continued to mine out from the original 110 permit area. <br /> We mined to the west and north working on the existing face. <br /> An additional 10. 14 ac. ± was mined as shown on the map this <br /> year (yellow) . We reached the mining limits on a small <br /> section of the north slope and increased the floor area as <br /> shown by 8 . 29 ac ± so the floor of the pit covers approxi- <br /> mately 14 . 41 acres at this time. <br /> (2) No reclamation was required this year. We have approxi- <br /> mately 225 feet Temporary bank sloping complete on the north <br /> and 685 feet on the south. The current grade on these <br /> slopes is 2h to lv (green) . The remaining slopes are in the <br /> active mining area so no sloping will be done until the <br /> reach the exterior of the mine. <br />