Laserfiche WebLink
iii iiiiiiiiiiiu iii <br />999 <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />Mine: N~°W ~~,c <br />Date: <br />Waste Bank No: <br />General Description or Reference to Site Plan: <br />~f <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />I~IVew Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surface Drainage System <br />^ Placement of Underdrain(s)' <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year24-hourappurtenant drainage structures, evidence of positive <br />drainage. <br />Nd Lv~o~~°viGe o7'~ SPr~~SS Or- sec°~~e l.~qS D~I'cr~ <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. // l /I <br />SD~'u_° Mi ~I Of ~ /'o~n~ gPPP~r'r5 ?~ ~l9~ bt~°.~l f ~°r'~5~.tir./ <br />q5 I°V'io~PhcPd l7y ~-~ac~s ~i'o•~ 7`/'~c~ P~ur'P~hC4t~`. ,=~i3 <br />o~nZ°o~ 9S /~ca~+rtP.~rc~ v~ur~^9 iafP<'~~ ct~~c~ .~~?s"l0• <br />~ ~piam~'ro~l 5~~.~~ be f~~{o~~,w~ pr~0/' ro ~/Q~P.~~•,~ m ~' <br />Sob No. 28,170 Page 1 of 2 <br />