Laserfiche WebLink
<br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />fu <br />Date: <br />r~7 <br />III IIIIIIIIIIIII III <br />Waste Bank No: <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />~ew EIk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surtace Drainage System <br />^ Placement of Underdrain(s)~ <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year24-hourappurtenant drainage structures, evidence of positive <br />drainage. /~ <br />/VD ~U~~-ice ~7` SP~I~SS ar ~c~%v~ .Se~~'S~ <br />was o d~~~-4°~. <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />aSONt~ M;nor ~r~~~r~ ~(~s 6ee~ P~~~'~~~o/ o~ <br />Job No. 28,170 Page 1 of 2 <br />