My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32480
DRMS
>
Back File Migration
>
Report
>
REP32480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:38 AM
Creation date
11/27/2007 6:15:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Report
Doc Date
4/18/1984
Doc Name
REVISION TO FILL UNDERDRAIN CARBON JUNCTION MINE DURANGO COLO
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />REVISION TO <br />FILL UNDERDRAIN <br />CARBON JUNCTION MINE <br />DURANGO, COLORADO <br />April 17, 1984 <br />RECEIVED <br />APR 18 1984 <br />MINED LAND RECLAMATION DIVISION <br />Colo. Dept of Natural Resources <br />The underdrain structure described on pages 6 and 7 of the May 4, 1983 <br />Response to Final Adequacy Concerns for Carbon Junction Mine Permit <br />Application is further revised as to construction and design. <br />To facilitate construction of the underdrain, the Carbon Junction <br />channel bottom will be smoothed to a 10 foot width from the designated toe <br />of the fill (see Map 5-1), 1,300 feet upstream into the pit. Boulders, <br />brush and vegetation will be removed from the underdrain area. As they are <br />available, soils will be stripped and stockpiled. <br />The natural stream flow upstream from the underdrain will be <br />intercepted by the west collection channel (WC). Previous to diversion, <br />the WC will be constructed through the area of pit segments A-1 and D-1 <br />maintaining the grade and channel dimensions specified in Appendix 5-2. <br />This temporary channel, as illustrated on the Map 5-1, will be maintained <br />until such time as mine segment A-1 ie completed. The WC will then be <br />routed into pit segment A-1 as previously described on page 58 in the <br />permit application. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.