Laserfiche WebLink
iii tiiiiiiiiiiiiiii <br />999 <br /> <br />March 08, 1999 <br />DECEIVED <br />MAR 10 1999 <br />Mr. Jim Dillie ~~ivisiono~Minerats&Geoio9Y <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-98=112, TR-U10 <br />weekly Pond Compliance Report <br />March O1, 1999 - March 06, 1999 <br />Dear Mr. Dillie: <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of March O1, <br />1999 - March 06, 1999 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.021 ppm CN-wad and 0.274 <br />ppm CN-total. The collection pond averaged 0.018 ppm CN-wad and 0.028 <br />ppm CN-total. <br />Sincerely, -~ <br />~~ <br />Ron Zu alt <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />