Laserfiche WebLink
iii iiiiiiiiiiiuiii <br />August 07, 1998 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 60203 <br />RECEIVED <br />AUG 1 0 19~ <br />DIV. OF MINERALS <br />8 GEOLOGY <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />weekly Pond Compliance Report __ <br />August 02 -/^'Au/Ag\ust 08, 1998 <br />Dear Mr. Dillie:`/~`J <br />Attached is a summary of the on-site cyanide analysis performed on <br />samples from the tailings pond and the collection pond during the week <br />of August 02 - August O8, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and 0.057 <br />ppm CN-total. The collection pond averaged 0.026 ppm CN-wad and 0.093 <br />ppm CN-total. <br />Sincerely, <br />~L/) /7 <br />O"-7 <br />Ron Z wait <br />cc: Bill Lyle <br />Dan Robertson <br />