My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31393
DRMS
>
Back File Migration
>
Report
>
REP31393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:07:26 AM
Creation date
11/27/2007 5:54:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991082
IBM Index Class Name
Report
Doc Date
5/30/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ <br />? • III III III III IIII III <br />Notice of Intent to Continue Mining Operations RE C.E1\~ED <br />110c Construction Materials Annual Report <br />Permittee Name: Tiger Timber Inc MAY 3 0 1997 <br />Permit No. M-91-082 <br />Operation Name: Tiger Timber Site* <br />Anniversary Date : March 17 , 1997 Division of Minerals !~ Uooloav <br />Total: $225.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: ~,6 b. County where mine is located: %feLB/t <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br />Does this mine operate MORE or LESS than 180 days per year? MORE `ESS <br />3. Does this mine have a phased reclamation plan? S.~ NO <br />4. Total acres affected during the report year:* )~S ~~'~~' <br />5. Total acres reclaimed for the report year:* ~1(oar. <br />6. Total number of a^_res in topsoil replacement st>_ge: ~~y QG~ <br />a. Average thickness of topsoil replaced: NOUN <br />7. Total number of acres seeded: {Jd /~~ <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />10. Estimated total acres to be affected in the next report year:* _ ~ ~pc~f <br />11. COMMENTS: <br />* Please show the location of the acreage for items 4 - 6 on your snap**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased ant. dates <br />reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be state6 above. <br />Signature: C~'~^~'L oa""~^""/ Date: 6- 2~-~'~ <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: F.?AK/( LRUG/1L!-/ Phone: ( 7/P ) ?`~~ 36Z l <br />FAX NO: ( ) <br />Company: Ti 6.t,f T'iMgle <br />Address: p0. ~jpK /28 <br />ti,~r(~ G'/F,Qe6.c CYO <br />Federal Tax ID No. or Social Security No.: 7y Z29.SZ O 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.