My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP30734
DRMS
>
Back File Migration
>
Report
>
REP30734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:01:14 AM
Creation date
11/27/2007 5:42:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
11/23/1992
Doc Name
3RD QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • • Ill l11111l11 <br />999 IIl1lll <br />ORCHARD VALLEY MINE <br />3ccS. QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />iqq~ <br />Item Y/N <br />i Comments <br />1. Quantity of waste material added [o Y ' Approtdmately 2,148 tons of cob were added to the waste <br /> waste disposal area this quarter? disposal pile this quarter. Reconstruction of the pile <br /> began on August 20, 1992 <br />2. Waste material deposited and compacted Y Exposed gob from previous salvage activity was regrade <br /> in 24" lifts? and compacted in maximum 24" lifts. New material <br /> <br />i added to the pile was also spread and compacted. <br />3. Drainage alterations constructed? Y The terrace on the east side of the pile was regraded <br /> to improve drainage on this side of the pile. The existin <br /> drainage pattern was maintained around the perimeter <br /> of the pile to protect outslopes and direct drainage to <br /> ditches a[ the toe of the pile. <br />4. Present height of waste material? Highest height approximately 63.0 fee[. Elevation <br /> decreased due [o existing exposed gob being spread <br /> out and com acted. <br />5. New bench constructed? N <br />6. Refuse material outslope placed at Y Slopes were checked for proper placement periodically <br /> 1V:2Houtslope? during construction. <br />7. Adequate drainage on top of completed Y i Grading was maintained on top of the exposed gob to <br /> fill? ensure proper drainage from the top of the pile. Pile <br /> reconstructed to reestablish appropriate grade. <br />3. Bench drainage adequate'? Y j Bench drainage was maintained throughout the quarter. <br /> <br />See item 3. <br />i <br />i <br />9. Outslopes covered with 4' non-toxic, Y <br /> non-combustible material? <br />10 . Berms constructed on outslopes? Y <br />11 . Evidence of structural defects'? N <br />
The URL can be used to link to this page
Your browser does not support the video tag.